1995 – 2000
Contract work at MNPZ
2001
General Contractor at MNPZ
2002
General contractor at RNPZ
2003
Construction of a vacuum gas oil hydrotreating complex and a sulfuric acid alkylation unit with an isomerization unit at the RNPP
2004
Construction of BMW Avtoport car dealerships on Pyatnitskoye Highway and on Leningradskoye
2005
- Reconstruction of the Eurocity Hotel in Kapotna
- Construction of the Nissan Autogrand dealership
2006
General Contractor at the Slavneft-YANOS plant
2007
Reconstruction and construction of gas stations in Ryazan, Yaroslavl, Kostroma, Vladimir, Kursk, Kaluga, Tambov, Tver regions.
2008
- Construction of ELOU AT 4 at the Slavneft-YANOS plant
-
Reconstruction of Ryazan and Kaluga oil depots
2009
Construction of tanks (with a volume of 50 thousand. m3) and a gallery loading ramp at the RNPZ
2010
- Construction of Closed mechanical treatment facilities at MNPZ
-
Reconstruction of the hotel "SPORT" in Yaroslavl
2011
- Construction of a catalytic cracking gasoline hydrotreating plant at the MNPZ and at the Slavneft-YANOS plant
-
Construction of an isomerization unit at the Saratov Refinery
2012
- Construction of a complex of low-temperature isomerization of ISOMALKS at the RNPZ
-
Construction of a combined isomerization plant at the Orsk Refinery
-
Construction of a hydrogen production plant at the Bashneft-Novoil plant
2013
- Construction of HFC plant at MNPZ
-
Reconstruction of the catalytic cracking plant at the Slavneft-YANOS plant with an increase in productivity by 1.5 million tons per year
-
Construction of the “Peresvet Resort”
2014
- Construction of a Visbreaking complex at the Orsk Refinery
-
Reconstruction of biological treatment facilities at the Bashneft-Novoil plant
2015
- Construction of BOS at Gazpromneft-MNPZ
-
Construction of a hydrocracking unit for the production of base oils of the third group at the Slavneft-YANOS plant
-
Construction of a hydrocracking complex at the Orsk Refinery
2016
- Construction of section 100 of the KUPN (Euro+) installation at Gazpromneft-MNPZ
-
Reconstruction of the combined catalytic cracking unit G 43-100
2017
Construction of OPC facilities for the ELOU AVT complex at the Omsk Refinery
2018
- Reconstruction of the hydrogen sulfide utilization plant at the Slavneft-YANOS plant
-
Construction of a complex for processing oil residues based on the delayed coking process at the Lukoil-Nizhegorodnefteorgsintez plant
-
Construction of a combined-cycle gas plant at the Voronezh CHPP as part of work with PJSC "Quadra"
2019
- Construction of a hydrocracking Plant at the Afipsky Refinery as part of work with Russneft,
-
Construction of catalyst production at Omsk Refinery
2020
Construction of an OUTN at Gazpromneft-MNPZ
2021
- Construction of MCC facilities, a/roads and landscaping within the framework of the construction of KGPN
-
Construction of Local treatment facilities and MCC (inter-shop communications)
-
Reconstruction of the BMW Avtoport showroom on Pyatnitskoye Highway
2022
- Construction of a circulating water supply unit (BOV-3) at Gazpromneft-MNPZ
-
Construction of a closed-type flare system at the Slavneft-YANOS plant
-
Reconstruction of the former hotel "Eurocity", now - "Porechye"