Reference list of JSC «PROMFINSTROY»

2019

General contractor
2002 — to the present day.
Overhaul of installations on the territory of OAO Gazpromneft-Moscow Refinery
Customer
Gazpromneft-Moscow Oil Refinery JSC, Moscow, Kapotnya, 2nd quarter, 1 cor. 3
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, anti-corrosion and commissioning
General contractor
2013 — to the present day.
Construction and installation works under the program of replacement of obsolete equipment (ZMU) for the needs of OAO Gazpromneft-Moscow Refinery
Customer
Gazpromneft-Moscow Oil Refinery JSC, Moscow, Kapotnya, 2nd quarter, 1 cor. 3
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, anti-corrosion and commissioning
General contractor
March 2016 — 2020
Reconstruction of the combined catalytic cracking unit G-43-107
Customer
Gazpromneft-Moscow Oil Refinery JSC, Moscow, Kapotnya, 2nd quarter, 1 cor. 3
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning
Subcontracting
June 2016 — May 2019
Construction of "Euro+ Combined Oil Refining Unit"
Customer
JSC "NIPIgazpererabotka", JSC "Gazpromneft-Moscow Oil Refinery" Moscow, Kapotnya, 2nd quarter, 1 cor. 3
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning
General contractor
July 2016 — 2019
Execution of a set of works according to the RS model for the facilities of the General Factory Economy (OPC) and General Factory Networks (OPC) within the framework of the implementation of the "Euro+ Combined Oil Refining Unit"
Customer
Gazpromneft-Moscow Oil Refinery JSC, Moscow, Kapotnya, 2nd quarter, 1 cor. 3
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning.Supply of materials and equipment.
General contractor
December 2016 — 2019
Execution of a complex of works according to the RS model for a closed-type Flare installation related to the General Factory Economy (OPC) and General Factory Networks (OPC) as part of the implementation of the "Euro+ Combined Oil Refining Unit"
Customer
Gazpromneft-Moscow Oil Refinery JSC, Moscow, Kapotnya, 2nd quarter, 1 cor. 3
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning.Supply of materials and equipment.
General Contractor (PSS)
  March 2019 — February 2020
repair work during operation in shop No. 1
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Installation of metal structures and equipment, electrical work, installation of instrumentation, thermal insulation work.
General contractor
March 2019 — July 2019
Stop-over repairs on the cracking and stabilization units of the Visbreaking unit No. 1
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation works, construction works. Work on AKZ and insulation.
General Contractor (PSS)
March 2019 — February 2020
Repair of workshop No. 2 of JSC "RNPC" during operation
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Installation of metal structures and equipment, electrical work, installation of instrumentation, thermal insulation work.
General Contractor (PSS)
March 2019 — February 2020
Repair of workshop No. 3 of JSC "RNPC" during operation
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Installation of metal structures and equipment, electrical work, installation of instrumentation, thermal insulation work.
General Contractor (PSS)
January 2019 — August 2019
Stopover repairs in 2019 at the second unit of the L-24/6 installation of shop No. 3
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Major repairs: installation of metal structures, pipelines, electrical work, installation of instrumentation, thermal insulation work. Poland.
General Contractor (PSS)
January 2019 — August 2019
Stop-over repairs in 2019 at the L-35-5/300 installation of shop No. 3 for gas-catalytic production
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, anti-corrosion and commissioning
General Contractor (PSS)
January 2019 — August 2019
Stop repair in 2019 at the atmospheric unit of the ELOU-AVT-3 (A-12/3) unit of Shop No. 1 (primary oil refining)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works, construction works, installation works with AKZ, insulation works, electrical installation works, instrumentation and control works.
General Contractor (PSS)
February 2019  — December 2020
repair of buildings and structures in workshops No. 1 and No. 2 in 2019-2020
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
General construction (finishing) works, installation works
General Contractor (PSS)
February 2019  — December 2020
repair of VMS installations 12/1, 24/600, 35-11/300, 35-11/600, 24/6, isomerization of shop No. 3 in 2019-2020
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
General construction (finishing) works, installation works
General Contractor (PSS)
January 2019 — August 2019
Stop repair in 2019 at the first unit of the L/24/6 installation of shop No. 3
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Major repairs: installation of metal structures, pipelines, electrical work, installation of instrumentation, thermal insulation work. Poland.
General Contractor (PSS)
January 2019 — August 2019
Stop repair in 2019 at the vacuum unit of the ELOU-AVT-3 (A-12-3) unit of shop No. 1 (primary oil refining)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation work, construction work. Work on AKZ and insulation.
General Contractor (PSS)
January 2019 — August 2019
shut-down repairs in 2019 on the furnace blocks at the ELOU-AVT-3 (A-12\3) plant No. 1 (primary oil refining)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Repair of furnaces; thermal insulation of works; replacement of the power supply system; repair of ventilation systems;repair of the pipeline;AK
General contractor
22.12.2017 — 31.10.2019
Work on the repair of tanks on the territory of the Branch of PJSC ANC Bashneft Bashneft-Novoil.
Customer
PJSC ANC Bashneft, 450077, Russian Federation, Republic of Bashkortostan, Ufa, Karl Marx str., 30, room 1. 
Types of work
Repair of tanks; repair of pipelines; painting;
General contractor
27.08.2018 — 30.06.2019
Work on the requirements and measures of the PPE on the territory of the branch of PJSC ANC Bashneft Bashneft- Novoil
Customer
PJSC ANC Bashneft, 450077, Russian Federation, Republic of Bashkortostan, Ufa, Karl Marx str., 30, room 1. 
Types of work
Repair of furnaces; thermal insulation works; replacement of the power supply system; electric heating; instrumentation;  repair of equipment and pipelines; AKZ