Reference list of JSC «PROMFINSTROY»

2018

General Contractor (PSS)
July 2018 — December 2018
Residual SMR and NDP on the project "Construction of a single laboratory building";
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
General construction (finishing) works, installation works (pipelines, metal structures, engineering networks, vent.equipment), work on AKZ and insulation, commissioning.
General Contractor (PSS)
July 2018 — December 2019
Replacement of pumps N-1A, N-2, N-2B in TP-1
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation works, construction works. Works on AKZ.
General Contractor (PSS)
July 2018 — October 2018
Residual construction, installation and commissioning works on the Object: "Construction of RVS-10000 Tanks No. 3 9.10 with reference to the existing vacuum gas oil pipeline";
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Works on AKZ and isolation of tanks, landscaping, commissioning.
General Contractor (PSS)
May 2018 — June 2018
Installation of modular metal scaffolding during the spring stop repair in the technological installations of JSC "RNPC" in 2018.
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
The construction of scaffolding with subsequent disassembly.
General Contractor (PSS)
February 2018 — August 2018
Stopping repair of the vacuum gas oil Hydrotreating unit (reactor unit) of Shop No. 2 (deep oil refining complex)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation work, construction work. Work on AKZ and insulation.
General Contractor (PSS)
March 2018 — November 2018
Performing repair work during the overhaul of AVT-1, AVT-4, shop No. 1, HFC shop No. 2, LG-35-8/ 300B, L-35-11/300 shop No. 3 for the replacement of critical technological pipelines made of Steel 20 in 2018 JSC "RNPK";
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation work, construction work. Work on AKZ and insulation.
General contractor
June 2017 — November 2018
Capital construction of the installation "Replacement of raw materials of UPV installations with natural gas. Conversion of process furnaces from liquid fuel to natural gas. Stage II"
Customer
JSC Slavneft-Yaroslavnefteorgsintez, Yaroslavl, Moskovsky Prospekt, 130
Types of work
General construction (finishing) works, installation works (pipelines, metal structures, engineering networks, vent.equipment), work on AKZ and insulation, commissioning.
General contractor
December 2017 — March 2019
Capital construction of the facility "Hydrogen Sulfide Utilization Unit (MK-2)
Customer
JSC Slavneft-Yaroslavnefteorgsintez, Yaroslavl, Moskovsky Prospekt, 130
Types of work
General construction (finishing) works, installation works (pipelines, metal structures, engineering networks, vent.equipment), work on AKZ and insulation, commissioning.
General contractor
March 2018 — April 2018
Overhaul of the Diesel Fuel Hydrotreating unit
Customer
JSC Slavneft-Yaroslavnefteorgsintez, Yaroslavl, Moskovsky Prospekt, 130
Types of work
Construction, mechanical installation works, works on AKZ, electrical installation works, work on the installation of instrumentation and control equipment.
General contractor
July 2018 — August 2019
Technical re-equipment. Modernization of inter–shop communications for connection of the hydrogen sulfide utilization plant "Wet catalysis - 2"
Customer
JSC Slavneft-Yaroslavnefteorgsintez, Yaroslavl, Moskovsky Prospekt, 130
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, anti-corrosion and commissioning
General contractor
January 2018 — December 2018
Performing repair work on the installations of shop No. 4 (outside the downtime schedule)
Customer
JSC Slavneft-Yaroslavnefteorgsintez, Yaroslavl, Moskovsky Prospekt, 130
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical work, installation of instrumentation and control systems, thermal insulation, anti-corrosion
General contractor
October 2018 — December 2019
Reconstruction of the GNE installation of shop No. 5
Customer
JSC Slavneft-Yaroslavnefteorgsintez, Yaroslavl, Moskovsky Prospekt, 130
Types of work
General construction, installation (metal structures, pipelines, equipment), electrical work, installation of instrumentation and control systems, thermal insulation, anti-corrosion
In a row
August 2018 — March 2021
Construction "Oil Residue Processing Complex. Construction phase II. "Installation of hydrotreating of diesel fuel and gasoline with a block of catalytic reforming of sulfur-containing gases. Title 18002"
Customer
LLC "LUKOIL-Nizhegorodnefteorgsintez" index 607650, Russian Federation, Nizhny Novgorod region, Kstovo, Industrial district, Central highway, 9
Types of work
Capital construction. General construction (piles, foundations, pedestals), manufacturing and installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning. Supply of materials and equipment.
In a row
August 2018 — March 2021
Construction "Oil Residue Processing Complex. Construction phase II. "Gas fractionating plant. Title 18003"
Customer
LLC "LUKOIL-Nizhegorodnefteorgsintez" index 607650, Russian Federation, Nizhny Novgorod region, Kstovo, Industrial district, Central highway, 9
Types of work
Capital construction. General construction (piles, foundations, pedestals), manufacturing and installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning. Supply of materials and equipment.
In a row
August 2018 — March 2021
Construction "Oil Residue Processing Complex. Construction phase II. "BPES. Installation for the production of elemental sulfur and sulfuric acid. Section 2000.2/4000.2. Title 11004"
Customer
LLC "LUKOIL-Nizhegorodnefteorgsintez" index 607650, Russian Federation, Nizhny Novgorod region, Kstovo, Industrial district, Central highway, 9
Types of work
Capital construction. General construction (piles, foundations, pedestals), manufacturing and installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning. Supply of materials and equipment.
In a row
August 2018 — March 2021
Construction "Oil Residue Processing Complex. Construction phase II. "Section 6000.2. Section of granulation, preparation for shipment and shipment of elemental sulfur (2nd granulation thread. Title 11004/1"
Customer
LLC "LUKOIL-Nizhegorodnefteorgsintez" index 607650, Russian Federation, Nizhny Novgorod region, Kstovo, Industrial district, Central highway, 9
Types of work
Capital construction. General construction (piles, foundations, pedestals), manufacturing and installation (metal structures, pipelines, equipment), electrical installation, installation of instrumentation and control systems, thermal insulation, video surveillance, anti-corrosion and commissioning. Supply of materials and equipment.
General contractor
22.12.2017 — 30.09.2018
Work on the repair of tanks on the territory of the Branch of PJSC ANC "Bashneft" "Bashneft-Novoil".
Customer
PJSC ANC Bashneft, 450077, Russian Federation, Republic of Bashkortostan, Ufa, Karl Marx str., 30, room 1. 
Types of work
Repair of tanks; repair of pipelines; painting;
General contractor
29.01.2018 — 30.04.2018
Repair of oil production unit 37/2 on the territory of the branch of PJSC ANC Bashneft Bashneft-Novoil
Customer
PJSC ANC Bashneft, 450077, Russian Federation, Republic of Bashkortostan, Ufa, Karl Marx str., 30, room 1. 
Types of work
Repair of furnaces; thermal insulation works; replacement of the power supply system; instrumentation; repair of equipment and pipelines; AKZ; cleaning; ventilation
General contractor
19.03.2018 — 31.12.2018
Repair of fixed assets during the inter-repair run of installations on the territory of the branch of PJSC ANC Bashneft Bashneft-Novoil
Customer
PJSC ANC Bashneft, 450077, Russian Federation, Republic of Bashkortostan, Ufa, Karl Marx str., 30, room 1. 
Types of work
Repair of tanks; thermal insulation works; replacement of the power supply system; repair of ventilation systems; pipeline repair; AKZ
General contractor
25.04.2018 — 31.12.2018
Repair of the UPV installation on the territory of the branch of PJSC ANC Bashneft Bashneft- Novoil
Customer
PJSC ANC Bashneft, 450077, Russian Federation, Republic of Bashkortostan, Ufa, Karl Marx str., 30, room 1. 
Types of work
Repair of furnaces; thermal insulation works; replacement of the power supply system; electric heating; instrumentation;  repair of equipment and pipelines; AKZ