Reference list

Reference list of JSC «PROMFINSTROY»

2018

General contractor
May 2018 — December 2018
Execution of a complex of works during a stop overhaul in 2018 at the ELOU-AVT-1 installation of shop No. 1 (primary oil refining)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works (pipelines with ZRA, insulation, metal structures, concrete coating, cable), construction works, installation works with AKZ, electrical installation works, instrumentation and control works.
General contractor
March 2018 — May 2018
Execution of a complex of repair works to replace the material execution of the coil of the radiant chambers of the furnace P-2 at the installation of ELOU-AVT-3
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works (pipelines with ZRA, insulation, metal structures, concrete coating, cable), construction works, installation works with AKZ, electrical installation works, instrumentation and control works.        
General contractor
March 2018 — November 2018
Execution of construction and installation and commissioning works for the replacement of heat exchange equipment of the AVT-4 installation
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works, installation works, construction works.
General contractor
January 2018 — February 2019
Performing repair work during operation in shop No. 1
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works, construction works, installation works with AKZ, insulation works, electrical installation works, instrumentation and control works.
General contractor
February 2018 — August 2018
Execution of works during the stop overhaul in 2018 at the Combined Sulfuric acid Alkylation Unit (alkylation unit) of Shop No. 2 (deep oil refining complex)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works, construction works, installation works with AKZ, insulation works, electrical installation works, instrumentation and control works.
General contractor
February 2018 — August 2018
Performance of works during the stop overhaul in 2018 at the AVT-4 installation (atmospheric unit) of shop No. 1 (primary oil refining)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works, construction works, installation works with AKZ, insulation works, electrical installation works, instrumentation and control works.
General contractor
November 2018 — July 2018
Implementation of the SMR for the repair of buildings and structures in 2017-2018. JSC "RNPC
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling works, installation works, construction works, including finishing.
General contractor
November 2017 — March 2018
Replacement of power transformers in TP-15A at the L-35/6-300 installation of shop No. 3
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Electrical installation and commissioning
General contractor
September 2017 — February 2018
Complex of repair works during operation in workshops №№ 10, 12, 13, 14, 15, transport and economic, 22, 23, 28, 30 (July-February) in 2017-2018)
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Construction, mechanical installation work, work on the AKZ and insulation, electrical installation work, installation of instrumentation and control equipment, commissioning. 
General contractor
April 2018 — December 2018
Maintenance and repair of technological equipment and pipelines in the workshops of Ammonia-2, CMU and K No. 1, PAK
Customer
JSC "Novomoskovskaya Joint Stock Company "Azot", Tula region, Novomoskovsk, Svyazi str., 10
Types of work
Construction, mechanical installation work, work on the AKZ and insulation, electrical installation work, installation of instrumentation and control equipment, commissioning. 
General contractor
June 2018 — February 2019
Stop-over overhaul of technological equipment and pipelines of workshops Ammonia-2, CMU and K No. 1 (SAK)
Customer
JSC "Novomoskovskaya Joint Stock Company "Azot", Tula region, Novomoskovsk, Svyazi str., 10
Types of work
Construction, mechanical installation work, work on the AKZ and insulation, electrical installation work, work on the installation of instrumentation.
General contractor
March 2017 — May 2018
Work in the Ammonia-2 workshop on repair with operational defect management at JSC "NAC "Azot"
Customer
JSC "Novomoskovskaya Joint Stock Company "Azot", Tula region, Novomoskovsk, Svyazi str., 10
Types of work
Construction, mechanical installation work, work on the AKZ and insulation, electrical installation work, work on the installation of instrumentation.
General contractor
August 2018 — September 2018
Provision of own repair of personnel by means of podmashevaniya-construction of modular wedge scaffolding "Layer Allorund" when performing repair work in the workshop of CMU and K No. 1 during the period of stop overhaul 
Customer
JSC "Novomoskovskaya Joint Stock Company "Azot", Tula region, Novomoskovsk, Svyazi str., 10
Types of work
The construction of scaffolding with subsequent dismantling.
General Contractor (PSS)
November 2018 — December 2018
Execution of construction and installation and commissioning works on the project: "Replacement of deaerator DE-1, pump MR-360A, heat recovery boilers KU-1,2 (2 pcs.), hydrogen sulfide tank E-4 and tank E-4A at the installation of the SKU: Replacement of heat recovery boilers KU-1,2 (2 pcs.) on the
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation works (pipelines and equipment), work on the ACZ and insulation, electrical installation work, commissioning.
General Contractor (PSS)
November 2018 — December 2019
Replacement of the main pipelines of the heating system from TP-1 to TP-3 of shop No. 12
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation work on the installation of pipelines and supports, work on the AKZ and insulation. Construction works (concreting).
General Contractor (PSS)
November 2018 — December 2018
Replacement of PPK with PPK with switching devices, pipeline fittings with valves with manual drive, ensuring safe and trouble-free operation in conditions of an extended interval between major repairs of the LG installation-35-8/ 300B of shop No. 3
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation works.
General Contractor (PSS)
November 2018 — April 2019
Installation of the UVG line from the L-24/600 installation to the KCA unit of the L-24-6 installation of shop No. 3 of JSC RNPK
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Construction works, mechanical installation works, AKZ and insulation, electrical installation works, instrumentation and control works, commissioning.
General Contractor (PSS)
June 2018 — December 2018
Equipping of tanks with pontoons of CJSC RNPC stage 3
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Installation of metal structures with AKZ, installation of aluminum pontoons, instrumentation and control works, commissioning.
General Contractor (PSS)
October 2018 — May 2020
Construction of new tanks No. 209, 210 with a volume of 3000 m for crude oil in the title 49/1.2 park for primary processing units ELOU-AVT-3, ELOU - AVT-4
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Construction works (earthwork, concrete), installation works (pipelines, metal structures), installation of engineering networks, installation of tanks with a pontoon, work on AKZ and thermal insulation, electrical installation work, work on instrumentation, installation of low-current systems, commissioning.
General Contractor (PSS)
July 2018 — December 2018
Replacement of pumps N-44 and N-44A. Shop No. 1. Installation of AVT-1.
Customer
JSC "Ryazan Oil Refining Company", Ryazan, Yuzhny Promuzel district, 8
Types of work
Dismantling and installation works, construction works. Works on AKZ.